The floor of a sports hall specifies the execution of a fireproof flexible coating

Flexible polyurethane coating

Sports hall floor specifications for making flexible fireproof coating www.denber-paints.co.il

Sports hall floor specifications for making flexible fireproof coating www.denber-paints.co.il

Area preparation:
  1. Removal of PVC coating if present.
  2. Cleaning and removing glue.

The concrete surface:

  • 3. Planetary diamond polishing in vacuum to obtain at least 50% surface area of ​​visible sharpened gravel. (Less than this is not enough to obtain sufficient adhesion to prevent the coating from separating from the surface).
  • 4. Opening expansion seams and widening cracks.
  • 5. Thorough vacuum suction.
  • 6. Applying a   standard 755 standard 755 penetrating epoxy primer – a transparent primer for complete impregnation. including cracks and expansion joints. Approved by the Standards Institute. and
  • 7. Drying 6-24 hours. and
  • 8. Inserting a backing profile for expansion seams. and
  • 9. Polyplex 225 elastomeric filling of the seams and cracks to “zero” height. and
  • 10. Coating these areas with a  standard 755 epoxy layer

The floor of a sports hall specifies the execution of a fireproof flexible coating

Flexible polyurethane coating

Gluing rubber sheets (if required):

  • 11. Laying out the 5 mm (or 7 or 9 mm) sheets of rubber rolls on the surface against the direction of rolling, so that the bumps are upwards. The rubber must be given time to sink and straighten. If the rubber comes in rubber surfaces and not rolled, there is no need to wait for subsidence and leveling. and
  • 12. Pick up one whole row next to the wall, apply glue with a serrated spatula and place the leveled rubber on the glue and fasten well and fasten to the wall and fasten to the floor. and
  • 13. So on row by row to cover the entire floor without gaps and fasten. Weights can be placed on the rubber for tightening for 24 hours. and

casting:

  • 14. Applying the first layer of  Tutgum Antiflame Standard 755 with a thin layer roller to fill the surface and obtain a smooth sealed layer. 24 hours later – a flexible casting of 2 mm Tutagum Antiflame Standard 755. And

markings:

  • Measurements and layout of templates and masking tape for straight lines. and
  • Applying  Denbergloss white paint/ standard 755 tints as required for all lot markings. and

Protective varnish:

  • After 24 hours of drying, apply a layer of  Denbergloss Clear Matt Silk Antiflame Standard 755 varnish over the entire surface. and

Denver Projects Company – Execution with over 30 years of experience. Warranty backed by an insurance policy. and